  B15 Standard Bulkhead

This instruction is based on the use of a B15 rated bulkhead, using 19mm thick PROMARINE®-450 and laminated on both sides with 0.8mm thick HPL (high pressure laminate)
 
 
Detail A
 Top and bottom channels
 
     
 
The first step in any installation is marking-off the positions of the bulkhead. This is usually done with a chalk line marked on the deck

Bottom channels PC-15-E are then cut to length and positioned on this line. The bottom channel can be secured to the deck by either tack welding or using self-tapping screws, depending on type of deck material.
 
Top channels PC-17-G can then be marked off and attached to the deckhead, again by either tack welding or using self-tapping screws. Care should be taken to align the top. Use of "plumb lines" and/or "spirit levels" is only recommended if the vessel is in drydock and stable.
 
Bulkhead Profiles

(click here to see the details)
PC-15-E
PC-17-G

PC-15-E

PC-17-G

 


Detail A

 

 
 
Detail A Detail B Detail C Detail D Detail E Detail F

Back..

 
 
 
 © Copyright 2008 Promat International (Asia Pacific) Ltd. All Right Reserved.